2010 New Lanes Surface Installation

May 19th, 2010 by johnreed Leave a reply »

Prior to this installation, our lanes consisted of the original wood lanes, with a synthetic overlay glued down on top of them. The new surface is going to be screwed down to the existing surface. The existing lanes will be leveled out, the new surface set down on top, and screws will be run completely through both surfaces as well as the wood lanes, to insure that the lanes will continue to be level.

Advertisement

Leave a Reply

You must be logged in to post a comment.